Shipley's Choice Dam Rehabilitation

Project Completion Date:

November 20, 2024

Project Location:

Shipley's Choice Dam

Project Owner:

Pay Dirt, LLC

Project Overview

The Shipley's Choice Dam was a 20 ft high earthen embankment constructed in 1980 to create an instream stormwater management pond for the Shipley's Choice subdivision.  In 2006, an enlarged wet area was discovered on the dam's downstream slope prompting emergency corrective work. Further engineering evaluations determined that long-term repairs would not be effective. The project included:

  • Remove dam and provide stable stream system along Bear Branch.
  • Replacement of 66" culvert pipe underneath W. Benefield Rd.
  • Closure of W. Benfield Rd. between Pixie Drive and Severnside Dr.
  • Removal of dam embankment.
  • Monitoring stream segments that are below and above the dam area.
  • Rehabilitation of the entire Bear Branch stream segment.

The benefits of the rehabilitation include the following:

  • Protection from potential property damage.
  • Bear Branch restoration will mimic the pre-development conditions.
  • Allows fish passage under W. Benfield and extends Bear Creek fish passage to North of Benfield Boulevard.
  • Reduce sediment flow to the Severn River.

Project Results

Project Gallery

No items found.
Contact us

Get in touch today

Ready to dig into new opportunities? Contact Pay Dirt LLC today and let’s uncover the solutions that will help you strike success!

Contact information
Check - Elements Webflow Library - BRIX Templates

Thank you

Thanks for reaching out. We will get back to you soon.
Oops! Something went wrong while submitting the form.