Here are some projects that Pay Dirt LLC has completed
The hydrologic and hydraulic analyses of Valentine Creek revealed that water quality and water quantity control could be met with a retrofit design. This included the construction of a forebay...
Annapolis Harbour Center Pond modifications included excavating the bottom of the existing pond to provide additional storage and includes a large wet pool, two forebays at the inlets, a wetland...
The Broad Creek/ Health Department Gully SPSC Restoration project was designed to restore stability and function to a 750 LF ephemeral gully that flows to the East Branch of Broad Creek...
The Shipley's Choice Dam was a 20 ft high earthen embankment constructed in 1980 to create an instream stormwater management pond for the Shipley's Choice subdivision. In 2006, an enlarged wet area..