Valentine Creek Restoration

Project Completion Date:

November 20, 2024

Project Location:

Valentine Creek

Project Owner:

Pay Dirt, LLC

Project Overview

The hydrologic and hydraulic analyses of Valentine Creek revealed that water quality and water quantity control could be met with a retrofit design. This included the construction of a forebay sediment-trapping system, constructed wetlands, and a series of grade controls, which included an SPSC system at the outfall of the pond and multiple grade controls downstream of the step pools to repair the incised channel. Together, these devices provide pollution reduction to help meet federal and state regulatory requirements, improve the function of the SWM facility, capture sediment loads, and restore natural drainage conditions. In addition, providing access to the forebay, channel, and wetlands will facilitate maintenance and sediment load management. Landscaping with site-specific vegetative wetland species enhances aesthetic and water quality benefits.

Project Results

Project Gallery

No items found.
Contact us

Get in touch today

Ready to dig into new opportunities? Contact Pay Dirt LLC today and let’s uncover the solutions that will help you strike success!

Contact information
Check - Elements Webflow Library - BRIX Templates

Thank you

Thanks for reaching out. We will get back to you soon.
Oops! Something went wrong while submitting the form.